Taking the blue line out of O’Hare airport and we are immediately being yanked around in every direction. Whereas in Tokyo, the curvature of the track and maximum speed inputted by the driver were linked.

In Tokyo, whenever I saw a long row of cushioned seats I thought to myself we could never have this in Chicago. It wouldn’t last one day before being barfed or pissed upon.

In Tokyo, Metro trains are equipped with multiple TV screens displaying the next station, number of minutes to arrival, and a diagram of optimal exits in relation to your current car number. In Chicago, we have two or three sheets of cardstock, that are occasionally not even lined up correctly. That’s the map.

The worst part is, JR is privatized, and they still manage to provide this high quality of service. How??

  • RickRussell_CA@beehaw.org
    link
    fedilink
    English
    arrow-up
    1
    ·
    1 year ago

    Yeah, the difference was VERY noticeable, when we asked our CNA co-workers about it they were like, “yeah, this floor is above the height requirement for soundproofing”. Apparently it was an issue because the corporate data center was on the next floor up and there were issues with vibration sensors going off :-)