• Kelsenellenelvial@lemmy.ca
    link
    fedilink
    arrow-up
    1
    ·
    1 year ago

    My utility gives a 50% credit on excess generation. Thing there is the utility is still the one taking responsibility for having the capacity and scalability to respond to variation in demand and production. When I was getting quotes, adding storage would have doubled the cost of the system for a day or two worth of storage. Probably would cost double again to have a system that would keep up through the winter.