• sheogorath@lemmy.world
    link
    fedilink
    arrow-up
    3
    ·
    1 year ago

    Blame management for that. I implemented Scrum in a project that I took over without any changes to the framework and it is great. We are able to keep a healthy work life balance, no overtime, good relationship between the product and the engineering team, and the most important thing is on time feature delivery.

    • flamboyantkoala@programming.dev
      link
      fedilink
      arrow-up
      0
      ·
      1 year ago

      Interesting you prioritized pointing out on time delivery as opposed to maximum value.

      Hits a sore spot, I’ve delivered a lot of useless stuff on time with agile teams. We could have been useless even faster without the meetings.